Location: Home Business Area Domestic Garbage
Domestic waste treatment

CSET mainly engages in the investment, construction, and operation of household waste incineration power generation projects through franchise operations such as BOT and BOO. Conduct harmless incineration treatment of household waste and carry out resource utilization around thermal energy, generate electricity through steam turbine generators, and provide heating services to surrounding industrial enterprises using the "cogeneration" model

On this basis, the company adheres to the concept of circular economy, continuously practices and successfully establishes a circular economy industrial park model, adds new business for the treatment of kitchen waste, sludge, and medical waste, greatly improving its level of reduction and resource utilization

 

Social and Economic Benefits

After incineration, the volume of landfill decreases by 95%

Each ton of garbage can generate about 380 kilowatt hours of electricity, which can supply a family of three for about 3 months

After incineration, the harm to the environment and human health is greatly reduced

 
CHP provides green heat energy

In the context of dual energy consumption control, the project adopts the "cogeneration" model to provide heating services to industrial enterprises within the industrial park where the project is located, achieving diversified, efficient, and high value-added utilization of thermal energy, and becoming the local infrastructure that provides heat source protection for economic development. Through the "cogeneration" model, the utilization effect of domestic waste resources is more significant, and the social benefits and economic value of the project are also improved

 
Circular Economy Industrial Park
Green cycle helps with the construction of "waste free cities"

The circular economy industrial park collaborates on the treatment and disposal of various types of urban waste such as household waste, kitchen waste, urban sludge, and medical waste. While achieving harmless waste treatment, the generated green energy such as electricity, heat, and biogas can be utilized in a tiered manner, improving energy efficiency, and achieving low-cost and efficient disposal of secondary pollutants. The company's Mianyang project belongs to the first batch of 50 resource recycling bases in China

Park Process Cycle Flowchart
  • Power cycle

    The electricity generated by the garbage incineration power generation project is supplied to the park project for self use, and the remaining electricity is input into the national power grid

  • Thermal energy cycle

    The steam generated by the waste incineration power generation project serves as a heat source for sludge drying in sludge treatment projects, pre-treatment of kitchen waste treatment projects, and medical waste steaming and sterilization treatment

  • Utilization of biogas

    The anaerobic generated biogas in the park enters the waste incineration power generation project for incineration or purification and compression into CNG

  • Sewage treatment

    The leachate and sewage generated in the park enter the leachate treatment station for centralized treatment

  • Water recycling

    The leachate can meet the standard after treatment. Reuse of clean water for slag extractors, fly ash stabilization, circulating cooling, flushing of factory roads and production workshops, and greening irrigation

  • Waste disposal

    The sludge, biogas residue, etc. generated by each project are treated and sent to the incineration power generation project for mixed incineration with household waste. The waste residue generated from incineration is comprehensively utilized

Introduction to the project company
Ningbo Zhongke

Ningbo Zhongke Green Power Co., LTD. (hereinafter referred to as "Ningbo Zhongke"), established in 2005, is responsible for the treatment of domestic waste in Ningbo Town and sea area.

 

In 2014, Ningbo Zhongke started the technical transformation project of grate furnace. Under the condition of not stopping production, the whole plant was transformed, and the technology upgrade from circulating fluidized bed incineration power generation process to grate incineration power generation process was realized. After being put into operation in 2017, the daily handling capacity of the two grate furnaces has reached 1200 tons, which has become the "demonstration project" of the existing incineration project.

1200 t/d

Processing scale

2 x 600 t/d

Incinerator

12 + 12 MW

Generator set

Cixi Zhongke

 

Cixi Zhongke Zhongmao Environmental Protection Thermoelectric Co., LTD. (hereinafter referred to as "Cixi Zhongke"), established in 2007, is responsible for the disposal of household waste in all areas of Cixi City, Zhejiang Province, and uses the heat generated by the burning of household waste to generate electricity and connect to the Internet. At the same time, Cixi Project adopts the mode of "cogeneration" to provide heating services to the surrounding industrial enterprises.

 

In 2017, Cixi Zhongke started the technical renovation and expansion project of the furnace. After the completion of the project, the daily waste treatment volume increased to 2250 tons/day, which can fully meet the needs of Cixi municipal household waste recycling, reduction and harmless disposal. Cixi Technical renovation project will become the "benchmark project" for the technical transformation and expansion of large-scale grate furnaces in China, making a significant contribution to the construction of ecological civilization and energy conservation and emission reduction of Cixi City.

 

3750 t/d

Processing scale

5 x 750 t/d

Incinerator

15 + 25 MW

Generator set

Mianyang Zhongke

 

Mianyang Zhongke Miantou Environmental Service Co., LTD., established in November 2013 with a registered capital of 400 million yuan, is located in Yuhuang Community, Yangjia Town, Fucheng District, Mianyang City. It is mainly responsible for the construction and operation of Mianyang "Zhongke Miantou Circular Economy Industrial Park".

 

Main business includes: household waste incineration power generation project, kitchen waste treatment, municipal sludge treatment, medical waste disposal four environmental protection projects, while the construction and maintenance of Mianyang Jiangyou City, Anzhou District waste transfer and compression projects, in the future will also carry out biogas utilization and other circular economy industry projects.

1500 t/d

Processing scale

3 x 500 t/d

Incinerator

20 + 12 MW

Generator set

Fangchenggang Zhongke

 

Fangchenggang Zhongke Green Energy Co., LTD. (hereinafter referred to as "Fangchenggang Zhongke Green Energy Co., LTD.") was established in April 2014 by Beijing Zhongke Runyu Environmental Protection Technology Co., LTD. (holding 99.33%) and Guangxi Mingyu Municipal Engineering Co., LTD. It is a company mainly engaged in urban household waste management services, power supply business, power generation technical services and solid waste management.

 

Fangchenggang Central Science is responsible for the construction and operation of Fangchenggang Municipal solid Waste Incineration Power Generation Project (referred to as Project) by BOT mode. The project is located in Baisha Village, Wangfu Street Office, Gangkou District, Fangchenggang City, Guangxi Zhuang Autonomous Region. The implementation of this project has played an important role in improving the sanitary environment and urban quality of Fangchenggang City.

 

The daily treatment scale of the project is 1000d/t, and the supporting construction is 2*500d/t mechanical grate furnace +9MW steam turbine +12MW generator, with an annual treatment of 360,000 tons of household waste.

1000 t/d

Processing scale

2 x 500 t/d

Incinerator

9 + 12 MW

Generator set

Santai Zhongke

 

Santai Zhongke Renewable Energy Co., LTD. (hereinafter referred to as "Santai Zhongke"), established in 2017, covers the whole county of Santai County, Yanting County and part of Zitong County, Mianyang City.

 

The project adopts grate furnace incineration process, and the designed waste treatment capacity is 1,500 tons/day. The first phase of the project has been put into operation, and the treatment scale is 1,000 tons/day, which greatly promotes the construction of local ecological and economic civilization.

1500 t/d

Processing scale

3 x 500 t/d

Incinerator

25 + 25 MW

Generator set

Jincheng Zhongke

 

Jincheng Zhongke Green Energy Co., LTD. (referred to as "Jincheng Zhongke"), established in 2013, the service scope includes Jincheng city and its surrounding areas.

 

The project uses mechanical grate furnace incineration process, flue gas purification using mature advanced processing technology. The project is planned to handle 800 tons/day, and strive to build the project into a landmark project in the central region.

 

800 t/d

Processing scale

2 x 400 t/d

Incinerator

15 MW

Generator set

Haicheng Zhongke

 

Haicheng Zhongke Green Energy Co., LTD. (referred to as "Haicheng Zhongke"), established in 2020, the service scope includes the whole area of Haicheng City.

 

The project adopts international advanced mechanical grate furnace incineration process, flue gas purification using mature advanced processing technology. The project is planned to handle 800 tons/day, and strive to build the project into a demonstration project in Northeast China.

800 t/d

Processing scale

2 x 400 t/d

Incinerator

18 MW

Generator set